button_drivewaybutton_epoxybutton_prevebtionbutton_colour

FAQ

Q  How long will the job take?

  • A high pressure clean will normally take 1 or 2 hours depending on the size of the job.

 

Q  Will I have to take my car out of the garage?

  • Yes – all vehicles need to be off the driveway prior to cleaning & sealing.

 

Q  How long before I can walk on it?

  •  Sealer takes approximately 30 mins to dry after the last coat is applied.

 

Q  How long will I have to leave my car out?

  • Vehicles can drive over, after 2 days.
  •  Vehicles can park on after 4 days.
     

    Quick Quote

    bottom-logo
    bottom-info
    bottom-image
    ROCK SOLID COATINGS. COPYRIGHT 2012. ALL RIGHTS RESERVED.